BETAENERJİ
Transformer Maintenance & Testing

- Checking the insulators on the cutter carriage for mechanical damage and cleaning their surfaces
- Washing the cutting mechanical parts with solvent chemicals, removing dirt and re-lubricating with suitable oil
- Lubrication of transition contacts with suitable contact lubricant
- Control of electrical components inside the breaker (coil, auxiliary contact etc.)
- Checking the interlocks
- Kesici Testlerinin yapılması ( Açma-Kapama Zamanı Testi, Kontak Geçiş Direnci Testi,DC İzolasyon Direnci Testi, %PF Testi)